Gateway New London
200 State Pier Rd.
New London, CT 06320
Phone: (860) 326-7027
Fax: (860) 326-7705
Email: info@gatewayt.com
In 2019, Gateway New London was selected by the Connecticut Port Authority as the winning respondent to the New London State Pier RFP and signed a long-term concession agreement to operate the terminal for 20+ years.
Gateway New London will serve as long-term hub for its Ørsted and Eversource's Northeastern offshore wind development.
“We look forward to continue working with the state, the City of New London and our partners the Connecticut Port Authority and Gateway Terminal, as we drive towards a green economy, bring more sources of clean energy to Connecticut, and ultimately lower carbon emissions for our planet.” - Thomas Brostrøm, Ørsted President of North America, May 2019
Terminal Overview
Location
-
Uniquely positioned to play a major role in the Offshore Wind industry - near offshore wind lease areas with direct access to the ocean – no bridge or overhead obstructions
Cargo Handled
-
Steel Products
-
Heavy Machinery
-
Specialty Cargo
-
Supersacs
Facility
-
Uniquely positioned to play a major role in the Offshore Wind Industry
-
Two 1,000-foot-long finger pier with 106,200 square feet of warehouse space
-
Direct access to the ocean with no bridge or overhead obstruction
-
Well-protected harbor with deep water access enables utilization of next-generation wind turbine installation vessels
Transportation Modes
-
Truck: Gateway owns and operates every type of truck needed to move every commodity we handle on and off dock
-
Marine: Gateway owns and operates a fleet of seven Jones Act tugs and barges
-
Rail: Direct connection to Genessee & Wyoming's New England Central Railroad (NECR)
Key Equipment
-
Connecticut Port Authority and Gateway New London LLC are partnering with Ørsted and Eversource to re-develop State Pier into a world-class state-of-the-art port facility with the heavy-lift requirements for offshore wind components.